Engineered for the application.
Our approach is to specify manufactured storage systems around applicable project requirements. Specific compliance claims must be supported by the manufacturer’s documentation and the final installation design.
RHM coordinates information with appropriately licensed professionals where required. Component manufacture does not establish approval of the completed installation.
What needs to be considered?
- Loaded pallet or material dimensions, weight and load distribution.
- System configuration, connections, compatibility and approved capacity information.
- Slab suitability, anchorage, site location and environmental or seismic loading.
- Forklift access, exits, fire protection, sprinklers and stored commodity classifications.
- Applicable local permits and professional documentation.
Canadian and U.S. standards have different roles.
CSA S345:23 addresses design and construction of steel storage racks within its scope; exclusions include cantilever, drive-in/drive-through racks and rack structures supporting floors or buildings. Those systems need their own appropriate design review. CSA A344:24 is a user guide for steel storage racks; it does not cover shelving. U.S. references include ANSI MH16.1-2023 for rack types within its scope and ANSI MH16.3-2025 for industrial steel cantilever racks. The applicable edition, scope and local adoption must be verified for each project.
These references are not a claim that RHM or every product in this directory holds a certification. Requirements across Canada, the USA and Mexico are not interchangeable.
Review requirements for the project location.
For projects in Canada, the USA or Mexico, confirm the applicable standards, approval process and professional authorisation with the project team and relevant local authority. Requirements vary by jurisdiction and installation; Canadian and U.S. references are not a substitute for checking the requirements that apply in Mexico.
Share the facility location, stored materials, storage heights, layout and available drawings. RHM can coordinate appropriately qualified structural, fire-protection and other specialist input where required. Project scope and service availability are confirmed through the enquiry process.
Reference review: 4 November 2026. Confirm current requirements with the authority having jurisdiction and your project professionals.